Customization: | Available |
---|---|
After-sales Service: | Trouble Shooting, Installation, Training |
Warranty: | 3 Years Including All Parts |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | FL-800S |
Laser Channel | 32-Channel |
Output Speed | 2.5m2/h |
Max. Breadth | 30" x 25"/ 762mm x 635mm |
Plate Thickness | 0.7-1.7mm |
Laser Power | High power semiconductor laser diode |
Plate Type | Digital relief flexo plate(water-wash), Digital flexo plate (water-wash), Digital flexo plate (solvent-wash) Steel based digital plates (Water/acohol washable) are applied for EM/SM series |
Application | Label and trademark |
Resolutions | 4000dpi |
Plate Loading | Manual load and unload |
Interface | USB2.0 |
Focus Adjust | Dynamic auto-focus |
Devise Size | 1630x1170x965mm (WxDxH) |
Net Weight | 800kg |
Power | 220V/50Hz, 60Hz, mainframe 1.5KW+Vacuum 1.1KW |
Environment | Recommended temperature: 18-30ºC Humidity: 10%-80% |
1. What are your main products?
Our main products are the Prepress 4up and 8up Online/Offline Thermal CTP, CTCP, VLF CTP and CTCP, Flexo CTP, Processor, Offset Plates, inks, Blankets, Postpress Packing equipments and so on. There are over 3000sets CTPs installed worldwide. Our partners in USA, Canada, Mexico, Colombia, Turkey, Hungary, South Africa and so on are very pleased with our technician support service and product performance.
We also have five offset plates production lines producing the thermal CTP plate(single and double layers), positive CTCP plates(single and double layers) and chemistry free CTP plate. You can get the prepress equipments and consumables all in one and no worry about the after-sales service from our company.
2. Where is your factory?
Our CTP machine factory is located in Hangzhou city, which is about 1.5 hour by train from Shanghai.
You are warmly welcomed to visit our factory!
3. What is your warranty for the CTPs?
Three years' Laser Head and main spare parts for the CTPs, One year for the Processor. If machine user uses our plate at the same time, we offer lifelong warranty.
4. What is the Lead Time?
Usually 20-30 days, and we will try our best to meet your demands.
5. Can you also supply the Workflow and RIP?
Yes, we can provide the Workflow Brain New and RIP Compose V9.
6. What about the Installation and after-sales technician support?
Our engineer can go to help the installation and provide the necessary training. The buyer should take the round air plane tickets and service charge and the local accommodation cost. Any problems or questions,we will be at your disposal 7x24 hours.